Please be aware that there is some engineering work to the electricity supply at our transmitter site on Thursday 8th and Friday 9th November. The work will take place between 09:00 and 16:00 both days.
On Thursday, it is unlikely that there will be any outages at all. If there does need to be any interruption to our supply, it will kept to an absolute minimum.
On Friday, we will need breaks in transmissions, possibly on several occasions. We will try and keep these outages to an absolute minimum.
We apologise in advance for spoiling your listening!
I think you must mean planned engineering work on thursday 9th and friday 10th november (not 8th and 9th). Also I understand from Angel Radio that there is to be a relay transmitter in Havant shortly. Could you post a map of this to be coverage area and when is the relay transmitter (presumably for the whole multiplex) due to switch on?
Well spotted on the dates Nick.