Between 22:00 and 06:00 on the 9th, 10th, 16th and 17th September there will engineering work taking place to the network we use to deliver audio from our stations to our transmitter. This means that on the above dates and times, there may be several breaks in our transmissions. We’ll try to ensure these are as short as possible, but some breaks of up to 10 minutes may be required.